TPG Engineering, led by Chris Tipper

Data centre recruitment for electrical, cooling and project delivery capability.

Engineer designing a server rack structure on screen

The Partnership Group recruits the trades and project leadership that help deliver Australian data centre projects: licensed electricians, HVAC and mechanical cooling technicians, supervisors, project managers, project engineers and commissioning support. The market is led personally by Co-Founder Chris Tipper, with the focus on people who understand high compliance, programme sensitive environments.

Public evidence supports the scale of the market pressure. The CEFC states that AI, cloud computing and digital infrastructure demand are driving a data centre boom, with Australian data centres expected to grow fourfold within a decade and capacity projected to rise from 1.35 GW today to between 4.7 GW and 7.4 GW by 2035. Microsoft has also announced an A$25 billion Australian investment by the end of 2029 across digital infrastructure, cyber defence and workforce skilling.

Where trades are already known, compliance current and matched to the site requirements, mobilisation can move quickly. For data centre environments, TPG confirms the role, access requirements, tickets and site specific compliance before committing to a start date.

Roles we fill

  • Construction Manager
  • Project Manager
  • Site Manager
  • Design Manager
  • Foreman and Supervisor
  • Contract Administrator
  • Project Engineer and Site Engineer
  • MEP design engineers: mechanical, electrical and hydraulic
  • Drafters and BIM coordinators
  • Estimator
  • Quantity Surveyor
  • Health, Safety and Environment Advisor
  • Scheduler and Planner
  • Building Supervisor
  • Electricians, plumbers, HVAC technicians, carpenters, joiners and shopfitters
  • Labourers and trades assistants

Compliant on day one, and still compliant in month six

Every person we put forward is checked against the role and the site before you see a name, and the checks do not stop at the start date. Tickets, licences and inductions are held against each person with their expiry dates, so a renewal is flagged before the shift rather than discovered on site. Onboarding, e-signatures, inductions, rostering and timesheets run through the one system, and the records are there when the auditor asks.

  • White Card sighted, expiry date recorded
  • High risk work licences and plant tickets, held with their expiry dates so a renewal is flagged before it lapses
  • Verification of competency for the plant and tasks on your site
  • Right to work and ID verified before anyone is presented
  • Project and site inductions completed before day one
  • SWMS and WHS acknowledgements signed digitally and kept on record
  • Two referees on every candidate

How we can work together

Permanent

Contingent or retained. Every permanent hire carries a 12 month replacement guarantee on our standard terms.

Contract

Project based hires with onboarding, timesheets and WHS handled by us.

Labour hire

Trades and labourers on site fast, compliant, with payroll and inductions covered.

Straight answers for this market

All guides

Book a discovery call

Tell Chris about the project and the team around the hire. He will confirm a realistic timeline when he takes the brief.